Project SAFE II – End of Project Evaluation

Consultancy Duration: November – December 2026

I. Introduction

Organizational Context  

Educo is a global development cooperation and humanitarian organization that have been working for more than 30 years and envisioned a world where all children fully enjoy their rights and lead lives of dignity by promoting just and equitable societies that guarantee their rights and well-being. 

In the Philippines, Educo has been transforming children’s lives for the past 20 years across 250 schools and 178 communities in Albay, Catanduanes, and Sorsogon provinces in the Bicol Region and Cotabato City in the Bangsamoro Autonomous Region in Muslim Mindanao (BARMM).  Educo Philippines and its projects are strongly committed to education, protection, and empowerment, champions children’s rights while fostering responsibility to help them thrive in a life of dignity. 

Educo Philippines is one of the implementing partners of ChorogUsan for Children (formerly known as ChildFund Korea). ChorogUsan is a child welfare organization that has been supporting initiatives in the Philippines since 2018. The organization has been promoting and advocating for children’s happiness and sound growth.  

Project Background 

The Province of Catanduanes, situated on the east-southeast portion of the Bicol peninsula, facing the Pacific Ocean, is the smallest among the six provinces in the Bicol Region. As of 2015, it has a total population of 260,964. The capital town, Virac, is the most populated among the province’s 11 municipalities, with a registered population of 73,650, while Gigmoto is the least populated with 8,368 residents.1 

Moreover, Catanduanes is highly vulnerable to hydro-meteorological hazards such as typhoons, floods, storm surges, and landslides. The increasing frequency and intensity of these hazards, exacerbated by changes in climatic conditions, have already brought significant damage to both life and property in the province. 

A Child Rights Situation Analysis (CRSA) study conducted by Community and Family Services International (CFSI) and Educo Philippines that highlights the weak child protection systems in times of emergency in the area covered by the study. During disasters, children have often been left out and less prioritized from Disaster Risk Reduction (DRR) activities which made them more vulnerable to physical, and psychological abuse and scarcity of education intervention after every calamity.2 

Recurring disasters do not only affect a child’s basic right to life, health, and education, but they cut across their right to participate and decisions to be made in their best interests. Addressing these will allow children’s vulnerabilities to be correctly addressed by policymakers to reduce the disaster impacts and strengthen community resilience. 

With this, Strengthening Accountability for Girls and Boys in DRRM Situations in Catanduanes (Project Safe II) is a three-year project is implemented by Educo Philippines and funded by ChorogUsan for Children (formerly ChildFund Korea). The project commenced in November 2023 and will conclude on October 2026, covering municipalities of Caramoran, San Miguel, and Virac, in the province of Catanduanes. 

The project aims to ensure that children are safe and protected before, during, and after a disaster.  

The project focuses on three key outcomes:  

  • (1) Increase children’s resilience and protection before, during, and after emergencies;  
  • (2) Strengthening responsive safety measures considering children at school before, during, and after a disaster;  
  • (3) Empowering community and capacitating duty-bearers for child protection in a a disaster situation. 

II. Objectives of the Evaluation 

The objective of the endline evaluation is to assess the situation of children, schools, communities, and duty-bearers in relation to disaster risk reduction and management (DRRM) in the project areas by measuring the endline status of all relevant indicators under the project goal and outcomes of the Strengthening Accountability for Girls and Boys in DRRM Situation – Catanduanes Project. The evaluation will compare baseline and endline results for each outcome and indicator to determine the extent to which the project’s intended outcomes and targets have been achieved. The endline evaluation will provide a comprehensive analysis of changes observed between the baseline and endline assessments.  

For each outcome and indicator, baseline and endline findings will be presented and interpreted to explain the significance of the changes, including their implications for children, schools, communities, and key duty-bearers such as Barangay Child Organizations (BCOs), School Disaster Risk Reduction and Management Teams (SDRRMTs), Barangay Disaster Risk Reduction and Management Councils (BDRRMCs) and Barangay Councils for the Protection of Children (BCPCs). 

In addition, the evaluation will also be guided by the OECD-DAC evaluation criteria of Relevance, Coherence, Effectiveness, Efficiency, Impact, and Sustainability. These criteria will be used to examine the overall performance of the project and answer the following key evaluation questions: 

  • Relevance: To what extent did the project respond to the priority DRRM needs, capacities, and vulnerabilities of children, schools, communities, and duty-bearers in the target areas? 
  • Coherence: To what extent was the project aligned and complementary with local and national DRRM policies, plans, systems, and the interventions of other stakeholders? 
  • Effectiveness: To what extent were the intended outcomes, outputs, and targets achieved, and what factors facilitated or constrained their achievement? 
  • Efficiency: To what extent were project resources, including time, funding, partnerships, and human resources, utilized efficiently to achieve intended results? 
  • Impact: What positive or negative, intended or unintended changes can be observed among children, schools, communities, and duty-bearers as a result of the project interventions? 
  • Sustainability: To what extent are the benefits, capacities, systems, and practices established through the project likely to continue after project completion? 

The evaluation will also identify and explain indicators that show limited, no, or negative change, exploring the underlying causes and external factors that may have influenced performance. Furthermore, it will generate credible evidence on project achievements, gaps, sustainability, institutionalization, lessons learned, and good practices. These findings will support Educo Philippines, project staff, partners, communities, children, duty-bearers, and other stakeholders in understanding the effectiveness of project interventions and the factors that contributed to or hindered the achievement of intended outcomes. 

Finally, the evaluation will draw lessons learned and document good practices that can inform future DRRM programming. Evidence-based recommendations will be developed to strengthen ongoing and future interventions, partnerships, implementation arrangements, monitoring systems, sustainability strategies, and organizational learning. The endline evaluation will collect and analyze data against all indicators defined under the project’s outcomes and outputs, as presented below. 

Outcomes/Outputs Expected Time for Results Indicator Baseline (of the whole project) 
1. Increase children’s resilience and protection before, during and after disasters through child-led activities 3rd quarter of FY 2026 # Of organized children actively involved in BCO-led activities related to Disaster Risk Reduction and Management   0 
3rd quarter of FY 2026 # Of produced hazard map with assessment of vulnerabilities and capacities in the Barangay and contingency plan as prepared by the BCOs 0 
2. Strengthening responsive safety measures considering children at school before, during and after disaster 3rd quarter of FY 2026 # Of Schools with Child-centered Disaster Risk Reduction Plan 0 
3rd quarter of FY 2026 # Of School personnel capacitated to respond to disaster situations   0 
3rd quarter of FY 2026 # Of in-school children participated in the school-based Earthquake and fire drills 0 
3. Empowering the community and capacitating duty-bearers for child protection in a disaster situation 3rd quarter of FY 2026 # Of Community-Based Disaster Risk Reduction Management Plan incorporating child protection in emergency standards 0 
3rd quarter of FY 2026 # Of functional Barangay Disaster Risk Reduction Management Council 0 
1.1. Barangay Children’s Organization (BCO) representative is part of the Barangay Disaster Risk Reduction and Management Council 1st quarter of FY 2024 # BCO organized with clear role and responsibility documented 10 
1st – 3rd quarter of FY 2024 # BCO members trained 0 
1.2. Child-led DRRM plans integrated into the Barangay Disaster Risk Reduction and Management Plan 2nd – 3rd quarter of FY 2024 # Of Hazard-Vulnerability-Capacity Assessment report with Hazard Map produced by BCOs 0 
4th quarter of FY 2024 # Of Contingency Plan produced by BCOs 0 
1st quarter of FY 2025 # Of Children’s DRRM Advocacy Plan Developed 0 
2nd quarter of FY 2025 # BDRRM Councils integrating BCO representative as a member with clear role and responsibility documented 0 
 2.1. Education in Emergencies integrated into the SDRRM Plan for possible fund allocation 2nd quarter of FY 2024 # Of School DRRM Team formed with clear role and responsibility documented 12 
 # Of members in School DRRM Team 0 Note: This is an additional indicator with no specified target.  
2.1. Education in Emergencies integrated into the SDRRM Plan for possible fund allocation 3rd quarter of FY 2024 # Of School Hazard-Vulnerability-Capacity Assessment report with Hazard Map produced by SDRRMT 0 
3rd quarter of FY 2024 # Of School Contingency Plan developed 22 
2nd quarter of FY 2025  # Of School DRRM advocacy activities conducted and attended by government authorities to boost possible funding DRRM activities in schools 0 
 # Of government authorities who attended School DRRM advocacy activities conducted to boost possible funding DRRM activities in school. 0  Note: This is an additional indicator with no specified target.  
2.2. School based child-friendly spaces in emergencies incorporating early warning systems, devices, and simulation exercise FY 2025 Quarterly # Of students participated in mock drill 0 
3.1. Child Protection in Emergencies indicated in the 0BDRRM Plan 2nd quarter of FY 2024 # Of children participated in a process of reviewing BDRRM Plan for integrating CPiE 0 
4th quarter of FY 2024 # Barangay DRRM Council members participated in CPiE 0 
Output 3.2 Activation of the Disaster Risk Reduction Management Council 1st quarter of FY 2025 # Of Barangay DRRM Council members with clear role and responsibility 0 
1st quarter of FY 2025 # Of Hazard-Vulnerability-Capacity Assessment report with Hazard Map produced by BCOs 0 
1st quarter of FY 2026 # Of people reached with DRR awareness raising campaign 0 
 3rd quarter of FY 2025 # Of Barangay DRRM Councils provided with Emergency Response supplies and equipment 0 

III. Methodology of the Evaluation 

The Endline Evaluation will adopt a mixed-method, participatory, child-sensitive, rights-based, and utilization-focused evaluation approach. The methodology is designed to determine changes that occurred between the baseline and the end of project implementation and assess the extent to which these changes can reasonably be associated with the project’s interventions. 

The baseline combined qualitative and quantitative information primarily derived from secondary/documentary sources with primary data gathered through Survey, Focus Group Discussions (FGDs) and Key Informant Interviews (KIIs).  

The following were the data collection method used during the baseline which will also be utilized in the endline evaluation: 

Data Collection Method Respondent Group Proposed Coverage 
FGD School DRRM Teams 1 FGD in each of the 30 schools 
FGD Barangay Children’s Organizations 1 FGD in each of the 30 barangays 
FGD Barangay Councils for the Protection of Children 1 FGD in each of the 30 barangays 
FGD Children 1 child-focused FGD in each covered area 
KII Municipal DRRM Office representatives Relevant MDRRMO representative in each municipality 
KII DepEd District DRRM Focal Persons Relevant focal person from each of the 6 school districts 
KII Barangay DRRM Committee Chairpersons or focal persons 1 key informant from each of the 30 barangays 

The endline will retain these core methods and respondent groups used during the baseline assessment to ensure consistency and comparability of findings. The questionnaires utilized in the baseline evaluation will also be carried forward to the endline, with the same questions maintained to enable a reliable measurement of changes and progress over the project implementation period. In addition, it will incorporate additional evaluation questions organised by the OECD DAC evaluation criteria (relevance, coherence, effectiveness, efficiency, impact, sustainability). Additional questions will also be designed to assess good practices, and lessons learned that are separated from the baseline questions.  

The evaluation will cover the same 30 project barangays and 30 schools across the municipalities of Caramoran, San Miguel, and Virac. The same sampling frame and respondent groups used during the baseline assessment will be retained at endline, allowing for a robust analysis of change over the project implementation period. 

MUNICIPALITY BARANGAYS SCHOOLS DISTRICT 
CARAMORAN 10 10 2 
SAN MIGUEL 10 10 2 
VIRAC 10 10 2 
TOTAL 30 30 6 

To ensure valid comparisons, the endline evaluation will compare the same schools, barangays, and respondent categories that participated in the baseline assessment. For each indicator, change analysis will be conducted using matched baseline and endline data from the same schools and barangays. Where a school, barangay, or respondent group was not covered during the baseline assessment or where baseline data are unavailable, such cases will be excluded from change calculations and reported separately. Any deviations from the original sample will be clearly documented and explained in the evaluation report. 

Participants in the data gathering will be purposively selected based on their roles, knowledge, and involvement in project implementation. They will include children, officers and members of Barangay Children’s Organizations (BCOs), School Disaster Risk Reduction and Management Teams (SDRRMTs), Barangay Disaster Risk Reduction and Management Councils (BDRRMCs), Barangay Councils for the Protection of Children (BCPCs), teachers, school administrators, local government officials, DRRM personnel, and relevant representatives from the Department of Education (DepEd).  

Educo’s Social Impact Measurement (SIM) will also form part of the endline evaluation, although it was not included in the baseline evaluation. The social impact measurement of Educo will provide further information that can support the endline analysis of the project specifically the impact criteras. As mentioned on the objectives impact measures the positive or negative, intended or unintended changes that were observed among children, schools, communities, and duty-bearers as a result of the project interventions. 

The SIM will be administered through surveys, which questions and survey tool is already available. The respondents of this SIM are the BCO officers. From a total population of 530 BCO members, a minimum sample of 223 respondents was calculated using a 95% confidence level, 5% margin of error, and 50% response distribution. The sample will be proportionately allocated as follows: 

Municipality BCO Population Allocated Sample 
Caramoran 215 91 
San Miguel 178 75 
Virac 137 57 
Total 530 223 

The evaluation will adhere to applicable ethical standards and child safeguarding requirements. Participation will be voluntary, and informed consent and child assent will be obtained, as appropriate. Participants will be informed of the evaluation’s purpose, the intended use of the information collected, their right to decline or withdraw, and the measures established to protect confidentiality. Data collection involving children will use age-appropriate and child-friendly methods and will follow the principles of Do No Harm, confidentiality, safety, dignity, and meaningful child participation. 

IV. Deliverable 

The evaluation process will be divided into three phases: preparation and design, data collection and analysis, and reporting. 

Phase Activity Schedules 
Preparation and Design Kick-off and Inception Meeting 3rd  week of November 2026 
Orientation on Educo Policies and procedures 3rd  week of November 2026 
Preparation and submission of work plan, evaluation tools, and field data collection methodologies by the External Evaluation Team 3rd Week of November 2026 
Collection and analysis of data Desk review – Project documents, internal and external documents, reports, and guidelines 3rd to 4th Week of November 2026 
Field data collection 3rd to 4th Week of November 2026 
Data processing, analysis, and report preparation 3rd to 4th Week of November 2026 
Presentation of initial results and validation of consultants to Educo 3rd to 4th Week of November 2026 
Reporting The first draft of the evaluation report will be submitted for review and feedback from the evaluation management team. The Evaluation Report requires the following outline:  Executive Summary; Project Background; Evaluation Objectives and Scope; Methodology (including limitations); Findings by Outcome (baseline vs. endline and analysis; Findings by Evaluation Criteria; Indicator Achievement Table; Conclusions; Lessons Learned and Good Practices; Recommendations; Annexes (data collection tools, list of respondents, data tables). 1st week of December 2026 
The final draft of the evaluation report will be submitted for review and feedback from the evaluation management team. 1st Week of December 2026 
Submission of PowerPoint presentation summarizing the evaluation: background and methodology, key findings by outcome, indicator achievement (baseline vs. endline vs. target), lessons learned and recommendations.  2nd week of December 2026 
Submission of of 3-5 pages Summarize Evaluation Report 2nd week of December 2026 

V. Qualification of Consultant 

  1. Educational Background 
  • Master’s Degree in Disaster Risk Reduction and Management, Development Studies, Social Sciences, Child Development, Environmental Science, or other related fields. 
  • A bachelor’s degree with extensive relevant experience may be considered. 
  1. Relevant Experience 
  • At least 5-10 years of professional experience in conducting evaluations of DRRM, humanitarian, development, or resilience-building projects. 
  • Experience in conducting End-of-Project, Endline, or Final Evaluations, preferably for projects funded by international donors. 
  • Experience in evaluating child-focused or child-centered programs, particularly those related to DRRM, child protection, resilience, or humanitarian action. 
  1. Technical Expertise 
  • Strong knowledge on DRRM Frameworks, including community-based Disaster Risk Reduction and Management, and resilience-building. 
  • Understanding child-centered DRRM, child rights, safeguarding, and inclusive approaches. 
  • Familiarity with the Philippine DRRM legal and policy frameworks, including: 
    • Republic Act 10121 (Philippine Disaster Risk Reduction and Management Act)
    • National DRRM Plan 
    • United Nations Convention on the Rights of the Child (UNCRC) 
    • Sustainable Development Goals (SDGs), particularly goals 4, 11, and 13. 
  1. Monitoring and Evaluation Skills 
  • Expertise in quantitative and qualitative research methodologies. 
  • Expertise in designing evaluation frameworks, sampling strategies, data collection, and data analysis. 
  • Experience conducting participatory and child-friendly evaluation methodologies, including Focus Group Discussion (FGD), Key Informant Interviews (KII), and age-appropriate participatory tools. 

VI. General Terms & Conditions 

Payment Terms 

The stated amount shall be deemed as the gross contract price and subject to applicable withholding tax. No additional payments shall be made unless mutually agreed upon in writing by both parties. 

The payment schedule will be as follows: 

Percentage of  
Professional Fee 
Deliverables 
50% Upon submission of the evaluation workplan; including refined evaluation objectives, data gathering methodologies and tools/instruments 
20% Upon submission of the first draft report 
30% Upon acceptance of the final draft report, submission of the PowerPoint presentation and 3-5 pages summary of the report 

Other terms & conditions 

Adhere to the following standards and policies: 

  • Anonymity and confidentiality: The evaluator must respect the right of individuals to provide information by ensuring that sensitive data cannot be traced to its source. 
  • Honesty and Integrity: The evaluator must accurately represent their level of knowledge and skills, work only within the limits of their professional abilities for the evaluation, accurately present their procedures, data and findings and be responsible in highlighting concerns mentioned or not in the TOR, if necessary, to obtain a more complete result.  The evaluator must be sensitive to the beliefs, manners and customs of the social and cultural environments in which they work. 
  • Independence: The evaluator must ensure that they are not unduly influenced by the views or statements of any actors involved and guarantee their independence and objectivity in the analysis of the data and information collected. 
  • Accountability: The evaluator is accountable for the quality completion of the evaluation deliverables within the timeframe and budget agreed.  In the event that any changes to the evaluation plan or any risks to the successful completion of the evaluation, the evaluator shall give Educo early notice. 
  • Intellectual property: During the assignment or at any time after the expiration or termination of the contract, the evaluation team may not disclose to any person or make use of any confidential information obtained during the course of this contract relating to the local partner organization and/or Educo, participants or any other person connected with the process.  The rights of the author and the publication of the documents produced by the evaluation team according to this agreement belong to Educo. 
  • Child Safeguarding Policy, Policy on Protection Against Sexual Exploitation, Abuse, and Harassment (PPSEAH), and Code of Conduct: The contractor commits to upholding ethical and responsible behavior in the delivery of their activity, with the utmost respect and fulfillment of Educo’s policies, codes and procedures; and accepts that non-fulfilment will lead to the termination of the contract with Educo, regardless of f the any type of consequence or responsibility that could result from this.  

VII. Guidelines for Proposal Submission 

Please submit your proposal to [email protected] not later than November 4, 2026. Proposals should contain the following:  

  • Curriculum Vitae of the Evaluation Team addressing the specifications mentioned 
  • Technical proposal  
  • Financial proposal to carry out the assignment 

Interested applicants will be evaluated based on their submitted proposal, the profiles of the evaluation team, and the results of interviews with the candidates. The assessment criteria and corresponding weights are as follows: 

  • Knowledge and Experience of the Evaluation Team (50%) 
  • Technical Proposal (30%) 
  • Financial Proposal (20%) 

VIII. Appendices 

Appendix 1:  

CARAMORAN VIRAC SAN MIGUEL 
BARANGAY SCHOOL BARANGAY SCHOOL BARANGAY SCHOOL 
Dariao Dariao ES Antipolo Del Norte Antipolo Del Sur ES Balatohan Balatohan ES 
Guiamlong Guiamlong ES Balite Balite ES District 3 San Miguel CES 
Inalmasinan Inalmasinan ES Batag Batag ES Juan M. Alberto Juan M. Alberto ES 
Maui Maui ES Capilihan Capilihan ES Pagsangahan Pagsangahan IS 
Maysuram Tucao-Maysuram IS Gogon Centro Gogon Centro ES Pangilao Pangilao ES 
Milaviga Milaviga IS Igang Igang ES Paraiso Paraiso ES 
Panique Panique IS Magnesia Del Norte Magnesia Del Norte ES Progreso Alma ES 
Supang Supang ES Pajo Baguio Pajo Baguio ES San Juan San Juan ES 
Toytoy (Palumbanes) Palumbanes IS Pajo San Isidro Pajo San Isidro ES Solong Solong PS 
Tubli Tubli ES Talisoy Talisoy ES Tobrehon Tobrehon ES 
Municipality Barangay Children (BCO members) BDRRMC members SDRRMT members 
Caramoran Dariao  16 22 11 
Guiamlong  18 25 9 
Inalmasinan  21 22 10 
Maui  22 22 19 
Maysuram  27 25 19 
Milaviga  28 22 19 
Panique  15 22 20 
Supang  25 22 18 
Toytoy (Palumbanes)  26 22 20 
Tubli  17 48 18 
San Miguel Balatohan  22 40 10 
District 3  21 29 22 
Juan M. Alberto  15 42 18 
Pagsangahan  16 18 27 
Pangilao  15 11 9 
Paraiso  24 22 8 
Progreso  20 38 22 
San Juan  15 32 17 
Solong  15 18 15 
Tobrehon  15 22 17 
Virac Antipolo Del Norte 15 48 14 
Balite  15 58 13 
Batag  15 52 20 
Capilihan  13 22 20 
Gogon Centro  14 50 23 
Igang  15 68 20 
Magnesia Del Norte  15 66 20 
Pajo Baguio  15 50 19 
Pajo San Isidro  13 22 22 
Talisoy  7 33 19 

Appendix 2:  

M&E Matrix 

Outcomes/Outputs Expected Time for Results Indicator Baseline (of the whole project) 
1. Increase children’s resilience and protection before, during and after disasters through child-led activities 3rd quarter of FY 2026 # Of organized children actively involved in BCO-led activities related to Disaster Risk Reduction and Management   0 
3rd quarter of FY 2026 # Of produced hazard map with assessment of vulnerabilities and capacities in the Barangay and contingency plan as prepared by the BCOs 0 
2. Strengthening responsive safety measures considering children at school before, during and after disaster 3rd quarter of FY 2026 # Of Schools with Child-centered Disaster Risk Reduction Plan 0 
3rd quarter of FY 2026 # Of School personnel capacitated to respond to disaster situations   0 
3rd quarter of FY 2026 # Of in-school children participated in the school-based Earthquake and fire drills 0 
3. Empowering the community and capacitating duty-bearers for child protection in a disaster situation 3rd quarter of FY 2026 # Of Community-Based Disaster Risk Reduction Management Plan incorporating child protection in emergency standards 0 
3rd quarter of FY 2026 # Of functional Barangay Disaster Risk Reduction Management Council 0 
1.1. Barangay Children’s Organization (BCO) representative is part of the Barangay Disaster Risk Reduction and Management Council 1st quarter of FY 2024 # BCO organized with clear role and responsibility documented 10 
1st – 3rd quarter of FY 2024 # BCO members trained 0 
1.2. Child-led DRRM plans integrated into the Barangay Disaster Risk Reduction and Management Plan 2nd – 3rd quarter of FY 2024 # Of Hazard-Vulnerability-Capacity Assessment report with Hazard Map produced by BCOs 0 
4th quarter of FY 2024 # Of Contingency Plan produced by BCOs 0 
1st quarter of FY 2025 # Of Children’s DRRM Advocacy Plan Developed 0 
2nd quarter of FY 2025 # BDRRM Councils integrating BCO representative as a member with clear role and responsibility documented 0 
 2.1. Education in Emergencies integrated into the SDRRM Plan for possible fund allocation 2nd quarter of FY 2024 # Of School DRRM Team formed with clear role and responsibility documented 12 
 # Of members in School DRRM Team 0 Note: This is an additional indicator with no specified target.  
2.1. Education in Emergencies integrated into the SDRRM Plan for possible fund allocation 3rd quarter of FY 2024 # Of School Hazard-Vulnerability-Capacity Assessment report with Hazard Map produced by SDRRMT 0 
3rd quarter of FY 2024 # Of School Contingency Plan developed 22 
2nd quarter of FY 2025  # Of School DRRM advocacy activities conducted and attended by government authorities to boost possible funding DRRM activities in schools 0 
 # Of government authorities who attended School DRRM advocacy activities conducted to boost possible funding DRRM activities in school. 0 Note: This is an additional indicator with no specified target.  
2.2. School based child-friendly spaces in emergencies incorporating early warning systems, devices, and simulation exercise FY 2025 Quarterly # Of students participated in mock drill 0 
3.1. Child Protection in Emergencies indicated in the 0BDRRM Plan 2nd quarter of FY 2024 # Of children participated in a process of reviewing BDRRM Plan for integrating CPiE 0 
4th quarter of FY 2024 # Barangay DRRM Council members participated in CPiE 0 
Output 3.2 Activation of the Disaster Risk Reduction Management Council 1st quarter of FY 2025 # Of Barangay DRRM Council members with clear role and responsibility 0 
1st quarter of FY 2025 # Of Hazard-Vulnerability-Capacity Assessment report with Hazard Map produced by BCOs 0 
1st quarter of FY 2026 # Of people reached with DRR awareness raising campaign 0 
 3rd quarter of FY 2025 # Of Barangay DRRM Councils provided with Emergency Response supplies and equipment 0